Frontline.ai deployed across 5k+ engineers conducting large CapEx projects
Engineering function for large capital expenditure projects supported by ~5K specialists
In this industry, deploying each new cell tower typically takes 18-36 months, depending on size and location and permits required. This makes optimizing workflows crucial.
Long-range and Capacity Planning solutions increased throughput and created additional capacity
20%
Increase in annual throughput
30%
Capacity created through redistributing
25%
Reduction in time to identify bottlenecks & fill with hiring
Deployed Long-range Planning solution
Maximizing throughput by allocating the time of each engineer to projects across stakeholders and the full process timeline
AI-powered Long-range Planning Solution helped managed time of engineers and allocated them to long-cycle jobs, enabling 20% increase in job throughput
System throughput comparison (baseline vs. leveraging AI job allocation)
Long cycle & ticket times
multi-year processes up to 36 months
Multiple stakeholder groups
or workforce touching the process at different times
Material job dependencies
from one step of the process to handover
Deployed Capacity Planning solution
Identifying additional areas of gap and surplus capacity